Leveling The Equipment - Vatech Green 16 Installation Manual

Table of Contents

Advertisement

5.6

Leveling the Equipment

T-shaped Hex
Wench
Sprit Level
1.
Prepare the Spirit Level.
2.
Turn the Rotating Unit clockwise so that the X-ray tube head faces the front, as
shown in the figure.
3.
Put the set screws into the four holes and turn them clockwise with the hex wrench
until they touch the aligning plate.
T-shaped Hex
Wench
Set Screw
Green 16/18 Installation Manual
5. Installing the Equipment: Wall Mount
8 mm / 0.3"
n/a
Ensure that the Spirit Level should rest only on the
locations indicated in the following figures to obtain the
accurate center.
8 mm / 0.3"
M10 x 20 – 4
pcs
(
Part No. 30)
81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents