Vatech Green 16 Installation Manual page 67

Table of Contents

Advertisement

4.
Remove nuts and washers put the anchor bolts into the holes.
5.
Secure the anchor bolts with the hammer.
6.
Place the base unit combined equipment in the proper position lock the nuts and
washers using a ratchet wrench.
Green 16/18 Installation Manual
4. Installing the Equipment: Base Stand (Optional)
59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents