Vatech Green 16 Installation Manual page 41

Table of Contents

Advertisement

6.
Put the Main Unit with the EPS (Main Base) on a Transport Dolly and move it
to the installation site.
<Transportation Example>
Green 16/18 Installation Manual
3. Before Installing the System
When putting the Main Unit on the dolly, make
sure that the center of the mass indicator is
aligned with the center of the dolly.
If you move the unit manually, make sure that the
persons holding the upper handle take the lead.
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents