4. Installing the Equipment: Base Stand (Optional)
4.7.2
Leveling Right and Left
1.
Place the Spirit Level, as shown in the image below.
2.
Turns each of the four screws on the base left and right until the bubble in the
spirit level comes to the middle. The location of each screw is circled in the image
below.
66
Place the spirit level as indicated in the images below to
obtain an accurate center of the equipment.
Green 16/18 Installation Manual