4. Before Installation:
Site Check List
Is the room large enough?
At minimum,
with CEPH unit : 2,804 mm (L) x 2,495.8 mm (W) x 2,435 mm
(H) / 111" x 99" x 96"
Without CEPH unit : 2,055 mm (L) x 2,495.8 mm (W) x 2,435
mm (H) / 81" x 99" x 96"
Is the door entrance wider than 800mm (32")?
Is a radiation protection plan in place?
Do equipment and PC use the same dedicated circuit?
Does the electrical input condition to the installation site meet
the MEIGaN requirements?
Is the local Network IP address of clinic 192.168.33.xx?
Is a compressor or air conditioner suction located right next to
X-ray Room?
Is the floor flat and level?
Is the carpet on the floor? If so, remove it.
Before Opening Boxes
Did the delivery company carry and handle with caution?
Did the installers take pictures of boxes before opening them?
Did the installer make sure there were no suspicious holes or
scratches on the box?
Is the ShockWatch indicator red?
Is the TiltWatch indicator red?
Green16/18 Installation Manual