Vatech Green 16 Installation Manual page 40

Table of Contents

Advertisement

3. Before Installing the System
4.
Remove the EPS (Main Right) and EPS (Main Left) as follows:
Remove the fixing tapes on the EPS by using a cutter.
Remove the Long Bolt and nuts by using two monkey wrenches.
Remove the EPS (Main Right) and EPS (Main Left).
5.
Pull out the Main Unit with the EPS (Main Base).from the pallet.
32
Green 16/18 Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents