Electrical connections
Synchronization
40
To synchronize several DMP41s, you need a synchronization cable with
HBM ordering
number1-KAB287-3.
ply voltages are phase-identical and phase-locked in all the DMP41s. The
status of the synchronization connection is displayed.
The total length of the synchronization chain (total cable length between
SYNC.OUT of the first DMP41 and SYNC.IN of the last DMP41) must be
less than 100 m.
SYNC.OUT device 1
SYNC.IN device 2
A03470_07_E00_00 HBM: public
Synchronization means that all the sup
First DMP41
Network patch cable
Second DMP41
DMP41