WBM KOMATSU GD655-6 Manual page 32

Table of Contents

Advertisement

MSW102 SNOW WING
PARTS, SERVICE AND INSTALLATION
ASSEMBLY AND INSTALLATION
ELECTRICAL INSTALLATION
Route the three wiring harnesses from the electrical box:
1. Route the wiring harness from the electrical box to the valve.
Route the wiring harness from the electrical box, through the cab floor, to the WBM
hydraulic valve. Install a grommet in the cab floor.
UNDERSIDE OF CAB SHOWN.
2. Route the wiring harness from the electrical box to the snow wing control panel.
Route the control panel wiring harness through the right side arm rest and strap
the wiring harness to the existing wires. Check that the armrest can move without
pinching the WBM wiring harness.
3. Route the power supply for the electrical box.
i. Locate the factory optional work equipment disconnect solenoid wiring harness
(labelled R4). The optional work equipment wiring harness is located on the
underside of the cab, on the left side, behind the ladder.
Weldco-Beales Manufacturing
UNDERSIDE OF
THE CAB, WITH
GROMMET
INSTALLED
WIRING
HARNESS FROM
ELECTRICAL BOX
TO WBM VALVE
APPROXIMATE LOCATION OF
THE FACTORY OPTIONAL WORK
EQUIPMENT WIRING HARNESS
WBM
ROUTE THE CABLES
THROUGH THE FLOOR
OF THE MOTOR GRADER
CAB TO THE SNOW
WING HYDRAULIC
VALVE.
INSTALL GROMMET IN
CAB FLOOR.
Page 32

Advertisement

Table of Contents
loading

Related Products for WBM KOMATSU GD655-6

This manual is also suitable for:

171-630-0110

Table of Contents