WBM KOMATSU GD655-6 Manual page 30

Table of Contents

Advertisement

MSW102 SNOW WING
PARTS, SERVICE AND INSTALLATION
ASSEMBLY AND INSTALLATION
HYDRAULIC INSTALLATION
iii. Load sense line: route the load sense hydraulic hose line from the WBM valve
load sense port, up the machine frame, mount the in-line flow control (needle)
valve, and route to the factory load sense line.
Two WBM provided hydraulic lines are required, one from the WBM valve to the
flow control (needle) valve and one from the flow control (needle) valve to
the factory load sense line. Use the provided hydraulic tee to install the WBM
hydraulic hose.
TEE INTO LOAD SENSE LINE
WBM
HYDRAULIC
VALVE
9. Install the valve cover.
Weldco-Beales Manufacturing
FLOW CONTROL (NEEDLE) VALVE
MACHINE'S
FLOW
FACTORY
CONTROL
LOAD SENSE
VALVE
LINE
WBM
Page 30

Advertisement

Table of Contents
loading

Related Products for WBM KOMATSU GD655-6

This manual is also suitable for:

171-630-0110

Table of Contents