Installation Procedure

The EXL10/XL10 PRIME utilizes a clip installation method to ensure a robust and watertight seal
to the enclosure. Please follow the steps below for the proper installation and operation of the
unit.
This equipment is suitable for Class I, Division 2, Groups A, B, C and D or non-hazardous
locations only.
Digital outputs shall be supplied from the same source as the operator control station.
Jumpers on connector JP1 shall not be removed or replaced while the circuit is live unless the
area is known to be free of ignitable concentrations of flammable gases or vapors.
1. Carefully locate an appropriate place to mount the EXL10/XL10 PRIME. Be sure to leave enough
room at the top of the unit for insertion and removal of the microSD™ card.
2. Carefully cut the host panel per the diagram, creating a 216mm x
opening into which the EXL10/XL10 PRIME may be installed. If the opening is too large, water
may leak into the enclosure, potentially damaging the unit. If the opening is too small, the OCS
may not fit through the hole without damage.
3. Remove any burrs and or sharp edges and ensure the panel is not warped in the cutting process.
4. Remove all Removable Terminals from the EXL10/XL10 PRIME. Insert the EXL10/XL10 PRIME
through the panel cutout (from the front). The gasket must be between the host panel and the
EXL10/XL10 PRIME.
5. Install and tighten the four mounting clips (provided in the box) until the gasket forms a tight
seal. NOTE: Max torque is 0.8 to 1.13 N m, or 7-10 in-lbs.
6. Reinstall the EXL10/XL10 PRIME I/O Removable Terminal Blocks. Connect communications
cables to the serial port, USB ports, Ethernet port, and CAN port as required.