Mitsubishi Electric MELSEC-LD77MS2 User Manual page 1021

Hide thumbs Also See for MELSEC-LD77MS2:
Table of Contents

Advertisement

Operation chart
The machine OPR is started.
The OPR is executed based on the positioning pattern set in AlphaStep/5-
1)
phase.)
Machine OPR start
(Positioning start signal)
OPR request flag
( Md.31 Status: b3)
OPR complete flag
( Md.31 Status: b4)
Md.26
Axis operation status
Md.20 Current feed value
Md.21 Machine feed value
(3) Servo OFF
For 5-phase (open loop control system), if the motor is moved by an
external force when servo OFF occurs, it is not possible to detect the
position and position information is not updated.
Do not rotate the motor during servo OFF. If the motors are rotated, a
position displacement occurs.
For 5-phase (open loop control system), "OPR request flag" (
: b3) turns ON in a servo OFF state. After turning servo ON,
Status
perform an OPR again.
For 5-phase (open loop control system) when an encoder is installed,
checking position displacement and maladjustments is possible by
monitoring "position feedback" and "external encoder counter value" in
the optional data monitor. Refer to the manual of AlphaStep/5-phase for
the units and increase direction of the encoder count value, and checking
methods.
V
ON
OFF
ON
OFF
OFF
Standby
Inconsistent
Driver OPR method
Appendix - 73
ON
OPR
Standby
OP address
Appendices
t
Md.31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec-l seriesMelsec-ld77ms4Melsec-ld77ms16

Table of Contents