Prepare The Server - Oracle SPARC T8-4 Installation Manual

Hide thumbs Also See for SPARC T8-4:
Table of Contents

Advertisement

Prepare the Server

Do not attempt to move the server alone without a lift. For a one-person installation,
Caution -
the components must be removed and a lift must be used. For a two-person installation, the
main components must be removed, and a lift is optional.
1.
Remove the server from the box.
See
"Shipping Kit" on page
2.
Remove all of the processor modules, the main module, the power supplies, and
the fan modules from the server.
Refer to the
3.
Determine your next step:
For a one-person installation, place the server on a mechanical lift.
For a two-person installation, place the server on a mechanical lift if one is
available.
4.
Remove the PCIe card carriers if there are PCIe cards that need to be installed.
Refer to the service manual for detailed instructions.
5.
Install the server in the rack.
See
"Installing the Server" on page
Related Information
"Physical Specifications" on page 17
"Handling Precautions" on page 25
"ESD Precautions" on page 25
"Tools Needed for Installation" on page 26
23.
SPARC T8-4 Server Service Manual
29.
for detailed instructions.
Preparing for Installation
Prepare the Server
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T8-4 and is the answer not in the manual?

Questions and answers

Table of Contents