Related Information
"Rack Compatibility" on page 30
■
"Rack Cautions" on page 30
■
"Installing the Rackmount Kit" on page 33
■
"Determine Correct Rackmount Hardware" on page 35
■
Install the Server
Do not attempt to move the server alone without a lift. For a one-person installation,
Caution -
all the main CRUs must be removed, and a lift must be used. For a two-person installation, all
the CRUs must be removed, and a lift is optional.
1.
Prior to installing the server, confirm that you have removed the following
components.
Both processor modules
■
The main module
■
All four power supplies
■
All five fan modules
■
Refer to the SPARC T8-4 Server Service Manual for removal instructions.
If you are using a mechanical lift, ensure that the lift is level and stable.
2.
Lift the server up to the correct height.
3.
Ensure that the bottom edge of the server has cleared the bottom of the shelf rails.
Install the Server
Installing the Server
39
Need help?
Do you have a question about the SPARC T8-4 and is the answer not in the manual?
Questions and answers