Component Engineering TA-10 Setup

The Component Engineering TA-10 can be used for theater automation with the SX-300. It
requires that the TA-10 be wired in a particular configuration. A wiring diagram can be seen in
Figure 66.
The TA-10 is connected to the SX-3000 server using the server's GPIO input/output port.
Configure event labels with the GPIO device to trigger the TA-10.
Figure 66 Component Engineering TA-10 wiring diagram
16

Testing Procedures for QC after Installation

After the installation has been completed, it is necessary to test the following to ensure that the
SX-3000 has been properly installed:
1. Test the video playback capabilities of the server using the following file formats:
MPEG2, JPEG2000, Scope, Flat, 3D.
2. Test the audio playback capabilities of the server and verify that all the channels are
working. Also check for any static noises.
3. Test the server's ability to activate automation cues using test cues for lights, curtains,
sound and fire alarm.
4. Test the remote access capabilities of the server, including: Theater Management
System (TMS) access, network connectivity and VNC.