Automation Scheduling - GDC SX-3000 Installation Manual

Hide thumbs Also See for SX-3000:
Table of Contents

Advertisement

14.3

Automation Scheduling

Automation event labels can be scheduled to be executed at a pre-arranged date and time, or
repeated daily at a pre-arranged time. To access the automation schedule select the [Schedule]
button on the [Actions] tab on the automation interface. This will bring you the automation
schedule configuration screen.
To add a scheduled automation event,
1. Select the [Add] button.
2. Set the date and time of the automation event, the repeat interval, and the event label
to be executed.
3. Click [Accept Changes] to save created schedules.
SX-3000 Installation Manual
Figure 48 Schedule automation events
Page 32 of 43

Advertisement

Table of Contents
loading

Table of Contents