SECTION 3 - BASE COMPONENTS
Brush Carrier Assembly - Remove/Install
3
1. Stator/Brush Carrier Screws (Pump Rear)
2. Stator/Brush Carrier Screws (Pump Front) (a)
NOTE: (a) Removed previously with motor cover disassembly (shown for reference only).
Brush Assembly - Remove/Install
1
2
3
4
5
3
Brush Assembly - Remove/Install
1. Brush Assembly (a)
2. Brush Carrier Socket
3. Brush Tab Slot
NOTE: (a) Slide brush assembly into socket until tab is in slot at
rear of socket.
3-24
1
Brush Carrier Assembly - Remove/Install
4. Brush Terminal Screw
5. Brush Attach Terminal
– JLG Lift –
4
3. Mark Brush Carrier Position on Motor Housing
4. Brush Carrier Assembly
Tank Remove/Install
3
2
1
Tank - Remove/Install
• For reassembly reference, place a mark on t ank and valve body.
1. Tank Assembly
2. Tank Screws (Qty. 4) 4. Reference Mark
Note: (a) Lubricate o-ring with clean hydraulic fluid before sliding
tank over during installation.
2
3. O-Ring Seal (a)
3121228