JLG 10MSP Service And Maintenance Manual page 42

Table of Contents

Advertisement

SECTION 5 - MAST COMPONENTS
Mast Section 4 - Assembly
1. Lay the narrow chain set attached to the cylinder
attach anchor block at the top of mast section-2 into
the open rail on mast section-3.
Top of Mast Section-3 - Narrow Chain Set Layout
1. Narrow Chain Set
Attached to Chain Anchor
Block on Mast Section-2.
NOTE: 
Before sliding mast sections together, spray the slide 
pad channels with Krytox lubricant spray, (JLG P/N- 
3020041). Be careful not to scratch or score the 
anodized finish in the slide pad channels.
2. Carefully slide mast section-4 into section-3 until
ends are even.
3. At the bottom of mast section-4, install the slide
pads between mast section-3. and 4. Shim per
instructions in step 7, Mast Section 2 - Assembly.
 Apply Loctite #242 to the threads of the pad screws
on final assembly.
Bottom of Mast Section-4 - Slide Pad Installation
1. Slide Pads
2. Shim Stock 
5-18
2. Chain Anchor Block 
3. Mast Section-3
3. Shim Pad Screws (Apply
Loctite #242)
 – JLG Lift –
4. Slide mast section-4 out the top of mast section-3
approximately 1 ft. (31cm).
5. Locate the lower chain anchor bracket (one with the
threaded attach holes in a triangular shape pattern) .
6. Working at the bottom end of mast section-4, insert
the threads (stud) ends of the (narrow) chain set,
now laying between mast section-3 and 4, into the
holes of the lower chain anchor bracket. Loosely
thread two (2) 3/8"-16UNC nuts onto the stud
threads on each chain.
7. Slide the anchor plate into the closed rail at the bot-
tom of mast section-4 and attach the anchor plate to
the bottom of mast section-4 with three (3) 1/4"-
20UNC x 3/4" long bolts. Apply Loctite #242 to
threads on final assembly.
Bottom of Mast Section-4 - Chain Anchor Installa tion
1. Lower Chain Anchor Bracket
2. Anchor Bracket Screws (a)
3. Narrow Chain Set Studs
 Note: (a) Apply Loctite #242 to threads on final assembly.
8. Slide the top of mast section-4 back in even with the
top of mast section-3.
9. Insert slide pads into the top end mast rails between
section-3 and -4, (one on each side of the mast) ,
with beveled surface facing inward towards section-
3.
10. Thread slide pad attaching bolts, two (2) 1/4"-
20UNC x 3/8" long hex head bolts through holes in
outside rail, on top of mast section-2 and into the
slide pad inserts. Thread in enough to hold pad in
place.
4. Chain Adjust and Jam
Nuts
3121228

Advertisement

Table of Contents
loading

This manual is also suitable for:

3121228

Table of Contents