11. Shim per instructions in step 7, Mast Section 2 -
 Assembly. Apply Loctite #242 to attach screw
threads on final assembly.
Top of Mast Section-4 - Slide Pad Installation
1. Slide Pads
2. Shim Stock 
 Note: (a) Apply Loctite #242 to attach screws on final assembly.
12. Attach the sequencing cables and hardware to the
side of the mast assembly.
Side of Mast Section-2 - Lower Sequence Cable Bracket
1. Mast Section-2
2. Lower Bracket Attach
Screws
3. Lower Bracket
4. Sheave Wheel Attach Bolt
3121228
3. Slide Pad Attach Screws (a)
5. Sheave Wheel Thrust
Washer 
6. Sequence Cable Sheave
Wheel
7. Spacers (Qty. 4)
– JLG Lift –
SECTION 5 - MAST COMPONENTS
Side of Mast Section-3 - Lower Sequence Cable Bracket
1. Mast Section-3
2. Lower Bracket Attach
Screws
3. Lower Bracket
4. Sheave Wheel Attach Bolt
Side of Mast Section-4 - Lower Sequence Cable Bracket
1. Mast Section-4
2. Bracket Attach Screws
13. Install the platform junction box to ground control
station wiring harness (See Figure 5-7.) , including
the platform junction box, powertrack assembly, har-
ness cable sheave assembly, and harness spring
tensioner to the side of the mast assembly. Refer-
ence Section 4, Platform Junction Box Install/
Remove.
If equipped, re-install the OPTIONAL 7 ft. height li mit-
 ing switch and bracket to the mast (See Section 5.5,
Platform - 7 FT. HEIGHT Limit Switch - OPTION  ).
14. The mast assembly is now complete and ready to
install onto the base frame.
5. Sheave Wheel Thrust
Washer 
6. Sequence Cable Sheave
Wheel
7. Spacers (Qty. 4)
3. Lower Bracket
5-19