Introduction; In This Chapter - Simplex 4190 Graphical Installation And Instructions Manual

Graphical command center
Hide thumbs Also See for 4190 Graphical:
Table of Contents

Advertisement

Jumpers, Interrupts, and Switch Settings

Introduction

In this Chapter

Chapter 6
This chapter provides information about installing boards (cards) in the GCC.
The GCC is usually shipped with the cards installed. However, if you do need to
install a card or modify a configuration, you may find this information helpful.
The jumper, switch and IRQ settings for the following cards are described in this
appendix:
Media cards for RS-232 and wired configurations
UL card
Network Interface card(s)
Touchscreen controller card
This chapter discusses the topics listed in the following table. Refer to the page
number listed after the topic for information on that topic.
Topic
Interrupt (IRQ) Settings
Jumper Settings
Switch Settings
Configuring the Ports
Interfacing with the 4120 Network
Installing Cards and Jumpers
Verifying the Tape Drive Installation
Disabling the Reboot Watchdog
6-1
firealarmresources.com
See Page #
6-2
6-5
6-6
6-7
6-9
6-11
6-13
6-14

Advertisement

Table of Contents
loading

Table of Contents