ABB REB670 Series Applications Manual page 295

Table of Contents

Advertisement

1MRK 505 370-UEN D
IEC13000016 V2 EN-US
Figure 140: APC - Local remote function block
12.3.3
Switch controller SCSWI
SCSWI may handle and operate on one three-phase device or three one-phase switching
devices.
After the selection of an apparatus and before the execution, the switch controller performs
the following checks and actions:
A request initiates to reserve other bays to prevent simultaneous operation.
Actual position inputs for interlocking information are read and evaluated if the operation
is permitted.
The synchrocheck/synchronizing conditions are read and checked, and performs
operation upon positive response.
The blocking conditions are evaluated
The position indications are evaluated according to given command and its requested
direction (open or closed).
The command sequence is supervised regarding the time between:
Select and execute.
Select and until the reservation is granted.
Execute and the final end position of the apparatus.
Execute and valid close conditions from the synchrocheck.
At error the command sequence is cancelled.
Busbar protection REB670
Application manual
Section 12
Control
IEC13000016-2-en.vsd
M16596-3 v6
289

Advertisement

Table of Contents
loading

Table of Contents