Raven Command FLEX II Calibration And Operation Manual page 67

Table of Contents

Advertisement

3. Turn on the machine master switch, and press the accept button to proceed with priming.
NOTE:
Section valves and NCVs will open and product will be dispensed during this process.
FIGURE 5. Automated Boom Prime Page
When each section has operated once, the priming process is complete. The process can be interrupted at any
time by turning off the master switch, or pressing the back or exit button. By turning off the master switch or
pressing the back button, you can adjust the Section Auto-Operation Times. By pressing the exit button, the
test will be canceled and you will return to the Tests menu. Turn off the master switch when Priming is
complete.
4. For systems equipped with chemical injection, stationary priming must be done for each product using a self-
test speed in Automatic mode with all products on.
5. For systems equipped with recirculation, use the recirculation process to prime the booms.
Operation: Universal Terminal Definitions
OPERATION
57

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Command FLEX II and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF