APPENDIX C
Inspection
Walk-Around
Inspection of
System Cables and
Components
NCV Seal
Replacement
FIGURE 1. Service Parts (reference tables below for detail)
5
6
114
Frequency
1. With the system power on, ensure all installed AIM
2. Verify the boom cables are securely fastened to the
3. Inspect each NCV for damage and proper installation on
Weekly/as
4. Verify that the AIM Command FLEX™ II CANbus
needed
5. Inspect system cables, sensor cables, connections, fuses,
1. Turn off the AIM Command FLEX™ II system and product
After 500 hours
or as needed.
Inspect both
2. Bleed any remaining pressure from the boom system.
before and after
3. Perform the Nozzle Control Valve maintenance
spray season.
1
2
3
4
RCM - Sprayer and AIM Command FLEX™ II Calibration and Operation Manual
Procedure
Command FLEX™ II NCV LEDs are flashing. If not, check
the cable connections to the NCVs and the fuses in the
fuse block located near the boom on the chassis cable
harness.
boom and are not hanging below the lower boom tube.
the nozzle bodies.
terminators (located on the boom cables on each boom
tip) are present and securely tied to the boom cables.
and relays for trapped moisture, corrosion, stretching, or
other signs of potential damage. Repair or replace as
needed.
Systems that have significant debris or product buildup,
and those that are cleaned with high pressure water
often may require more diligent inspection.
pump.
procedure (page 116).
Valve Body Removal Tool
(P/N 321-0000-490)
Need help?
Do you have a question about the Command FLEX II and is the answer not in the manual?