Installing Digital Service Units; Overview; Unpack, Position, And Ground The Dsu Node - Mitel 3300 Technician's Handbook

Integrated communications platform
Table of Contents

Advertisement

Installing Digital Service Units

Overview

WARNING: Do not apply power to the equipment at
any time during equipment installation.

1. Unpack, position, and ground the DSU Node

(page 63).
2. Connect the fiber cable to the DSU (page 64).
3. Install a DSU card (page 65).
4. Install the interface assembly on cards (page 66).
5. Program the DSU (page 79).
Next: Install any other required Service Unit (see
"Overview" on page 29). If all the Service Units are
installed, go to "Installing Phones and Peripherals" on
page 80.
Unpack, position, and ground the DSU Node
CAUTION:
cuit board cartons at this time.
CAUTION:
ing Brackets if you want to stack cabinets on top of
each other. Stacking cabinets without these brack-
ets could result in damage to the equipment or
injury.
1. Open the DSU node carton.
2. Remove the plastic bag from the top and sides of the
cabinet. Lift the DSU node out of the carton.
3. Check that the node and all attached equipment are
undamaged. Repack and return any damaged
equipment.
4. Place the node in its assigned position.
Do not open or unpack any printed cir-
Ensure that you use the Cabinet Stack-
Installation
63

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents