Check Scd Performance - Agilent Technologies 8355 Sulfur User Manual

Chemiluminescence detectors
Hide thumbs Also See for 8355 Sulfur:
Table of Contents

Advertisement

Check SCD Performance

SCD and NCD User Manual
1
Gather the following:
Evaluation column, DB-1 30 m × 0.32 mm × 1.0 μm (part
number 123-1033)
SCD performance evaluation (checkout) sample
(5190-7003): 0.7 ± 0.002 mg/L diethyl disulfide and
1.0 ± 0.003 mg/L tert-butyldisulfide in isooctane.
Chromatographic-grade isooctane
4-mL solvent and waste bottles or equivalent for
autoinjector
2-mL sample vials or equivalent for sample
Inlet and injector hardware (See
Chromatographic Checkout"
2
Verify the following:
Chromatographic-grade gases plumbed and configured:
helium as carrier gas, air as oxidizer, and oxygen as ozone
supply gas.
Ozone supply gas moisture trap and other traps are in
date.
Empty waste vials loaded in sample turret.
4-mL solvent vial with diffusion cap filled with isooctane
and inserted in Solvent A injector position.
4-mL solvent vial with diffusion cap filled with isooctane
and inserted in Solvent B injector position.
3
Replace consumable parts (liner, septum, traps, syringe, and
so forth) as needed for the checkout. See
Chromatographic Checkout"
4
Install the evaluation column. (See the procedure for in the
GC Maintaining Your GC manual.)
Bake out the evaluation column for at least 30 minutes at
180 °C. (See the procedure for in the GC Maintaining
Your GC manual.)
Configure the column.
5
Check the detector baseline output. The output should be
below 150 pA and relatively stable, assuming a
well-stabilized system with the column oven at 50 °C.
However, a new burner (or a burner with a new ceramic
tube) can have a very high baseline after first ignition. In this
case, the baseline should gradually decrease, depending on
Performance Verification
"Prepare for
on page 107.)
"Prepare for
on page 107.
7
109

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8255 nitrogen

Table of Contents