Replace The Quartz Tube (Ncd) - Agilent Technologies 8355 Sulfur User Manual

Chemiluminescence detectors
Hide thumbs Also See for 8355 Sulfur:
Table of Contents

Advertisement

5
Maintenance

Replace the Quartz Tube (NCD)

WA RNING
C A U T I O N
C A U T I O N
76
To replace the NCD quartz tube:
The oven, inlets, and detectors can be hot enough to cause burns.
Cool these areas to a safe handling temperature before beginning.
Wear clean, lint-free gloves to prevent contamination of parts with
dirt and skin oils.
Most steps in this procedure require the use of two wrenches, one
to hold the burner steady and the other to loosen a part. Always use
two wrenches to avoid over-torquing or bending the burner
assembly.
1
Gather the following:
Two 7/16-inch open-end wrenches
3/8-inch open-end wrench
5/8-inch open-end wrench
New quartz tube
Tweezers
1/8-inch cap for transfer line
T20 Torx driver
Dental tool or similar tool for graphite ferrule removal
2 New graphite ferrules
2
Prepare the detector for maintenance.
a
Load the GC maintenance method and wait for the GC to
become ready. (See
page 69.) Wait until the inlets, oven, detectors, valve box,
burner assembly, and detector base cool to a safe handling
temperature (< 40 °C).
b
Turn off all hydrogen flows. (Leave on the oxidizer and
ozone supply gases.)
c
Turn off the ozone generator.
"Detector Maintenance Method"
SCD and NCD User Manual
on

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8255 nitrogen

Table of Contents