Agilent Technologies 8355 Sulfur User Manual page 10

Chemiluminescence detectors
Hide thumbs Also See for 8355 Sulfur:
Table of Contents

Advertisement

1
Getting Started
Table 1
7890B GC Learning Products
Learning product
Getting Started
Safety Manual
GC, GC/MS, and ALS Site Prep Guide
Installation and First Startup
Operation Manual
10
Available manuals
Contents
Overview of the manuals. Where to
find information. How to install the
manuals. Overview of the GC.
Lists safety and regulatory
information. Precautions for using
hydrogen carrier (or fuel) gas.
Precautions for performing
maintenance tasks.
Requirements for: space and weight
for the lab bench, power, heat
dissipation, exhaust venting,
laboratory conditions (expected local
environment), gas and reagent gas
purity, gas supplies, gas plumbing
(including filters, regulator types, and
tubing needs), and cryogenic cooling
supplies (if used).
Recommended supplies to purchase
before installation.
How to install the GC on the
laboratory bench. Cabling pinouts.
Common keyboard functions. Using
the keyboard to start runs and
sequences. Using the keyboard when
connected to an Agilent data system.
Methods and sequences overview.
Startup and shutdown. How to check
GC performance after installation.
Energy conservation (sleep/wake).
Early Maintenance Feedback.
Configuration.
When to use this documentation
Before installation, to prepare for a
safe installation process.
Before maintenance.
Before installation, to prepare the
laboratory site.
Before installation, to find what
supplies are needed for successful
installation (such as gases,
installation kits, gas purifiers,
regulators, tubing, fittings,
consumable parts, and so on).
At any time, to refer to expected
requirements for gas supplies,
regulators, cryogenic cooling
supplies, supply pressures, and so
on.
During installation.
To learn common operating tasks
(making a run, loading a method,
running a series of samples).
To learn how to use the GC keyboard
when under data system control.
Before a short-term or long-term
shutdown.
When starting up the GC after a
period of inactivity.
Whenever you need to verify
performance of the instrument
against factory standards, for
example, after certain maintenance
procedures.
To learn how to properly configure GC
components, especially when newly
installed.
SCD and NCD User Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8255 nitrogen

Table of Contents