5.3 Installing the Pedestal Base
5.3.1 Installation Procedure
Installation of the Islander Prime pedestal consists of the following general steps:
• Running conduits to the pedestal site
• Installing the base plate
• Installing the pedestal base
• Installing the pedestal
• Running the cable conduits to the installation hole and filling all open holes
5.3.2 Preliminary Setup
To perform the preliminary setup procedures for the pedestal site, proceed as follows:
Determine the exact location for the Islander Prime pedestal installation.
1
2
Run cable conduits for each type of cables to the Islander Prime location:
• One High Voltage conduit from the dispenser
• One Low Voltage conduit from the dispenser
• One Low Voltage conduit from the office
• One High Voltage conduit from the Mains Distribution Box
3
Run the cable conduits to the hole.
Notes:1) All conduits must be sealed when the unit is installed.
5.3.3 Assembly Parts
The following table lists the assembly parts required for the Islander Prime installation
(see
Table 7:
Item No.
1
2
3
4
MDE-5411A ForeHB Islander Prime Installation Manual · October 2018
2) Ensure that the conduits are the right length to reach above the pedestal base into the
pedestal itself. Various pedestal base heights are available; refer to the specifications
of the configuration that you have ordered to determine how far the conduits must
reach.
Table
7):
Islander Prime Assembly Parts
Description
Bolt, ICU
Nut, M10
Washer, Flat, SM10
Base plate
Qty
P/N
4
814904200
8
815103000
8
815300200
1
814353700
Installation
Page 39