Unpacking the Switch
Eight 3.5mm x 16mm wall
screws and washers
Four 10#-32T 4.7mm x
11mm equipment rack
screws
Warning
The device is heavy. Use both hands to lift it. You might injure
yourself or damage the device if you drop it. E94
After unpacking the switch from the shipping box, visually inspect it for
damage and verify the contents. The switch should include the items in
Figure 18. Contact your Allied Telesis sales representative for assistance
if any items are missing or damaged.
Eight 4mm x 22.2mm
One AC power cord
The switch also comes with two equipment rack/wall brackets. Refer to
Figure 19 on page 48.
GS950 PS V2 Series of Gigabit Ethernet PoE+ Switches Installation Guide
wall anchors
Power cord
retaining clip
Figure 18. Package Contents
Eight M3 3mm x 6mm
bracket screws
Four bumper
feet
47