Choosing A Site For The Switch - Allied Telesis GS950 PS V2 Series Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for GS950 PS V2 Series:
Table of Contents

Advertisement

Chapter 2: Beginning the Installation

Choosing a Site for the Switch

46
Observe these site requirements.
If you are installing the device in an equipment rack, check that the
rack is safely secured so that it will not tip over. Devices should be
installed in the rack starting at the bottom, with the heavier devices
near the bottom of the rack.
If installing the device on a table, verify that the table is level and
secure.
The power outlet should be located near the chassis and be easily
accessible.
The site should allow for easy access to the ports on the front of
the switch, so that you can easily connect and disconnect cables,
and view the port LEDs.
The site should allow for adequate air flow around the unit and
through the cooling vents on the side panels.
Do not place objects on top of the switch.
The site should not expose the switch to moisture or water.
The site should be a dust-free environment.
The site should include dedicated power circuits or power
conditioners to supply reliable electrical power to the network
devices.
Copper cabling should not be exposed to sources of electrical
noise, such as radio transmitters, broadband amplifiers, power
lines, electric motors, or fluorescent fixtures.
Switch ports are suitable for intra-building connections, or where
non-exposed cabling is required.
If installing the device in a wiring or utility box, verify that the
enclosure has adequate airflow to prevent overheating.
Caution
The GS950/10PS V2 Switch does not have internal ventilation fans.
The installation site has to provide adequate airflow to prevent
overheating and system failure.

Advertisement