Physical Installation
2.3
Physical Installation
After unpacking the ONT, inspect it for damage. If damage is noted, file a claim with the carrier
and then contact ADTRAN. For more information, refer to the warranty.
Installation consists of positioning the ONT on a desktop (wall-mount is optional), and
connecting POTS (PHONE), Ethernet, Fiber, and Power.
g
NOTE
The 414 RG ONT can be mounted on a wall or desktop. For instructions for wall-mounting,
refer to the
(P/N 61287790F1-22) for instruction
2.3.1
Physical Installation Guidelines
The following are guidelines for this installation.
■ Read all warnings and cautions before installing or servicing the ONT.
■ Do not locate the ONT in direct sunlight or next to any thermal obstructions.
2.3.2
Required tools
Standard technician tools and those listed below are required for installing the ONT:
■ PON power meter with wavelength filtering
■ Fiberscope or videoscope
For fiber optic connections, the following is required:
■ ODC Fiber cleaning tool
2.3.3
Physical Installation Overview
g
NOTE
Unless otherwise noted, Steps 2 through 6 apply to all the ONTs in this guide.
To install the ONT, complete the following steps in the order presented.
■
■
■
■
■
■
18
ADTRAN 414 RG 2 POTS/4 GigE ONT with 2.4 GHz WiFi Job Aide
Section 2.3.4.1, "Step 1: Attach the 424 or 434 ONT to the Base and Connect Fiber"
page 19
Section 2.3.4.2, "Step 2: Connect POTS"
Section 2.3.4.3, "Step 3: Connect Ethernet"
Section 2.3.4.4, "Step 4: Connect Power"
Section 2.3.4.5, "Step 5: Connect USB"
Section 2.3.4.6, "Step 6: Connect UPS (optional)"
on page 20
on page 21
on page 21
on page 21
on page 21
on
61287RGONT-29C
Revision C