6.
Use the 7/16-inch wrench to unscrew the coupling and union from the
probe.
Coupling
LC union
7.
Withdraw the LC union, coupling and capillary from the probe.
8.
Remove the LC union, capillary and seal from the coupling.
LC union
9.
Dispose of the capillary, PTFE liner, ferrule assembly, and seal in
accordance with local environmental regulations.
10. Use the needle-nose pliers to remove the conductive sleeve from the
inner bore of the probe assembly fitting.
5-56
Maintenance Procedures
GVF16 Ferrule
PTFE liner
The capillary, PTFE liner, ferrule assembly, and
Warning:
seal can be contaminated with biohazardous and/or toxic
materials. Ensure that they are correctly disposed of
according to local environmental regulations.
Capillary
Seal
Coupling