Waters 3100 Operator's Manual page 45

Table of Contents

Advertisement

5.
Secure the ESI probe by tightening the 2 thumbscrews.
ESI probe mounted on the source enclosure, showing the connections
Nebulizer gas connection
Desolvation gas
connection
ESI probe
electrical lead
Probe adjuster
assembly
electrical lead
6.
Connect the ESI probe's PTFE tube to the nebulizer gas connection.
7.
Ensure that the probe adjuster assembly's electrical lead is connected to
the instrument's probe connection.
8.
Connect the ESI probe's electrical lead to the instrument's HV
connection.
Warning:
tubing to connect the diverter valve to the ESI probe; use the
PEEK™ tubing supplied with the instrument.
Vernier probe adjuster
POWER
OPERATE
NEBULIZER
DESOLVATION
HV
APPI
PROBE
Probe adjuster assembly
To avoid electric shock, do not use stainless steel
Thumbscrew
Diverter valve
ESI probe
Installing the ESI probe
3-5

Advertisement

Table of Contents
loading

Table of Contents