Waters 3100 Operator's Manual page 177

Table of Contents

Advertisement

3.
Attach the NW25 tee, included in the startup kit, to the inlet of the
pump using the NW25 center ring, and then secure the connection with
a clamp.
4.
Attach the flanged end of a length of 1-inch ID vacuum hose to each open
port on the NW25 tee. Use the NW25 center rings and clamps provided
in the startup kit. Use the 7-mm nut driver to install the clamps.
5.
Connect the opposite ends of the two lengths of vacuum hose in
the two, 1-inch OD, straight, vacuum ports on the instrument's rear
panel. Secure the hose ends with clamps supplied in the startup kit;
install 2 clamps on each hose end.
TP02625
Connecting the oil-filled roughing pumpB-5
1-inch ID
vacuum hose
Clamps
Flange
NW25 tee
Pump inlet
step 4
to

Advertisement

Table of Contents
loading

Table of Contents