VAT 650 Series Installation, Operating, & Maintenance Instructions page 87

Pendulum control & isolation valve with cc-link interface with valve cluster functionality
Table of Contents

Advertisement

5.
Pull out the option board a little
6.
Push the connector release (1) a little down
and disconnect fan cable (2) from option
board
7.
Remove the interface board or replace it, if
existing master board is defect
8.
Remove the master board or replace it, if
existing interface board is defect
9.
Remove the option board or replace it, if
existing option board is defect
10. Insert all boards in reverse order as they
disassembled at correct positions (see
steps 9...7)
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 CH@vatvalve.com www.vatvalve.com
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4" - 10"), CC-Link
Description
2
1
280672EB
2010-12-15
Required tool
87/94

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents