VAT 650 Series Installation, Operating, & Maintenance Instructions page 25

Pendulum control & isolation valve with cc-link interface with valve cluster functionality
Table of Contents

Advertisement

12. Install the CC-Link wires, see also
«Connector type» table below
Note:
If cable at pos. A (first or last station) install
«TR» between 1 and 2
1 x blue to 1
1 x white to 2
1 x yellow to 3
If cables at pos. A + B (...stations...) install
2 x blue to 1
2 x white to 2
2x yellow to 3
13. Close the cover of connector and fasten the
screws a little
14. Connect the connector and fasten it with the
screws at controller (sample picture)
15. Push the cover down to controller and
fasten the cover screws (sample picture)
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 CH@vatvalve.com www.vatvalve.com
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4" - 10"), CC-Link
Description
A
280672EB
2010-12-15
Required tool
Screw driver
size 1
Pozidriv screw driver
size 2
Allen Wrench
2.5 mm
Pozidriv screw driver
size 2
25/94

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents