VAT 650 Series Installation, Operating, & Maintenance Instructions page 86

Pendulum control & isolation valve with cc-link interface with valve cluster functionality
Table of Contents

Advertisement

1.
Remove the panel screws
2.
Remove female screw locks from POWER
and SENSOR connectors
3.
Loosen and remove the LOCIC connector
screw
4.
Lift the panel carefully
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 CH@vatvalve.com www.vatvalve.com
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4" - 10"), CC-Link
Description
Required tool
Pozidriv screw driver
size 1
Open end wrench 4.5 mm
Open end wrench 10mm
280672EB
86/94
2010-12-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents