9.
Remove the wire coat carefully about 5mm
10. Insert the cable(s) at connector hosing as
shown in the pictures, see also chapter CC-
Link connector
Note:
If valve in CC-Link network is at «first or last
station» install the CC-Link cable at position
A and close B with blind plug C.
If valve in CC-Link network at
«...stations...» install the CC-Link cables at
position A and B.
11. Fasten the strain-relief screw until the cable
can not pulled out by manual force
VAT Vakuumventile AG, CH-9469 Haag, Switzerland
Tel +41 81 771 61 61 Fax +41 81 771 48 30 CH@vatvalve.com www.vatvalve.com
Installation, Operating & Maintenance Instructions
Series 650 DN 100-250 (I.D. 4" - 10"), CC-Link
Description
Shield
Pos. A
Pos. B
Required tool
Wire strippers
5mm
Screw driver
size 4
280672EB
24/94
2010-12-15
C