Signal Backplane Replacement Process - Barco DP2K SLP Series Service Manual

Hide thumbs Also See for DP2K SLP Series:
Table of Contents

Advertisement

Image 18-22
11.
Install the rail on the top of the projector as illustrated. Use a 3mm Allen wrench to fasten the 5 screws
(reference 4 Image 18-23).
Image 18-23
12.
Install all projector covers.

18.14 Signal Backplane replacement process

The process described below is a high level process for the replacement of the Signal Backplane.
Most stages refer to a detailed step-by-step procedure included in this document.
WARNING: Disconnect the power cord of the projector from the power net and wait a few minutes
(to discharge the capacitors) prior to starting this procedure.
Replacement process
1.
Switch off the projector and disconnect the power cord of the projector from the power net. Wait a few minutes
(to discharge the capacitors) prior to proceed with the next stage of this process.
2.
Remove the large dust filter from the projector front. See page 284.
Card Cage
R5906848 /04
DP2K SLP Series
227

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp2k-10slpDp2k-8slp

Table of Contents