2. PREPARATION FOR TRANSPORTATION
1)
When transporting the machine, observe the
various road rules, road transportation vehicle
laws and vehicle limit ordinances, etc.
2)
Make sure the cooling system has proper anti-
freeze if moving the machine to a cold climate.
3)
Select a proper trailer after confirming the
weight and dimensions from the page Section
2, Specifications.
4)
Check the whole route such as the road width,
the height of bridge, the limit of weight, etc.,
which will be passed.
5)
Get the permission from the related authority if
necessary.
6)
Prepare gangplank for safe loading referring to
the below table and illustration.
A
1.0
1.1
1.2
1.3
1.4
1.5
B
3.65–3.85
4.00–4.25
4.35–4.60
4.75–5.00
5.10–5.40
5.50–5.75
5-2
Overall
width
Overall
height
Overall length
Loading plate
of trailer
Block
15 ~ 16°