4)
TRANSPORTATION
Make sure that the traveling path is al-
ways cleared.
When transporting material, lift the
bucket 40–50 cm above the ground.
5)
COMPACTION
When operating, keep the bottom of the bucket
horizontal to the ground.
Do not work with the bucket set in the
DUMP position.
6)
LOADING
Maximum efficiency can be attained by carrying
out work in such a way that the swinging angle
and the traveling distance are kept as small and
short as possible in accordance with the terrain.
(1) I method
After digging out the soil, move back-
ward and position the dump truck be-
tween the heap of soil and the ma-
chine to load the soil into the truck.
This is the fastest and most efficient
way to load material.
The ground of the job site should
be always level and do not swing
or step on a brake pedal abruptly
with the boom raised.
4-17
73034OP11