(2) V method
Park the truck at an angle of 60 de-
grees toward the machine. After dig-
ging out, drive backward and position
the machine at a right angle with the
truck and load the truck with the soil.
Position the machine so that the soil
can be dumped in the center of the
truck.
If the length of the truck is more than
double the width of the bucket, per-
form the dumping work from forward
to backward.
Move the control lever to the right
and dump the bucket.
Shake the bucket to throw off the soil
stuck inside. Move the bucket control
lever to the left and right and attach
the bucket to the stopper.
Shake the bucket before setting it to
the DUMP position so that loaded
materials are evenly distributed in-
side the bucket. This will prevent ma-
terials from slipping back when the
bucket is placed in the DUMP posi-
tion.
7)
PRECAUTIONS DURING OPERATION
(1) Permissible water level
Do not work in water or damp ground
deeper than the permissible depth
(up to the lower part of the axle hous-
ing).
After the work is completed, grease
parts which has been immersed in
water.