OLT STU128 Assembly Manual page 9

12x8 studio garden shed - plywood roof
Hide thumbs Also See for STU128:
Table of Contents

Advertisement

3.
Lay out 1A & 1C - Floor Joist Frames as illustrated.
There are 3 larger and 3 smaller Frame Sections. The
Footprint for the floor when attached together will be
136 1/2" wide x 96" deep.
5.
Complete all large and small
frame attachments. Screw each
completed section together with
8 - 2 1/2" screws.
7.
Attach 1F - Floor Runners
to completed floor frame. There
are 2 floor runners per 136 1/2"
side and 5 completed runners
in total. Use 3 - 2 1/2" screws
per runner section.
Toll Free 1-888-658-1658
Hardware
S1 - 2 1/2" Screws
x 16 total
Parts (Steps 7 - 9)
1F - Floor Runners
(1 1/2" x 3 1/2" x 68 3/16")
x 10
Hardware (Steps 7 - 9)
S1 - 2 1/2" Screws
x 30 total
www.outdoorlivingtoday.com
Page 9
You can find BR1 - Square
Drive Bit for the screws in
with the Hardware Kit Bag.
4.
Attach each large and small floor joist
frame together with 6 - 2 1/2" screws per
section.
Hardware
(S1 - 2 1/2" Screws) x 18 total
96"
136 1/2"
6.
When completed, your floor footprint
should be 136 1/2" wide x 96" deep.
8.
Make sure Runners are flush with outside
and front and rear floor framing but not
overhanging.
sales@outdoorlivingtoday.com

Advertisement

Table of Contents
loading

Table of Contents