OLT STU128 Assembly Manual page 28

12x8 studio garden shed - plywood roof
Hide thumbs Also See for STU128:
Table of Contents

Advertisement

53.
Locate second 3H - Small Roof Panel and align on roof tight to Large Roof Panel. Once Roof
Panel is positioned correctly, secure to rafters with 12 - S2 - 1 1/4" screws. Before attaching screws
pre-drill pilot hole with 1/8" bit to prevent rafters from splitting.
Facia Nailing Strips
(72" & 44" long).
54.
Locate 3M & 3N - Roof/Facia Nailing Strips. Strips will attach
to the bottom of plywood sheathing flush with edge as shown to the
right. Strips provides for a greater nailing surface later when you
attach side facia. Attach both pieces with 7 - 1 1/4" Screws total
leaving a 1 1/2" gap at front and rear. Evenly space screws. Attach
remaining cleats to panels to opposite side.
Toll Free 1-888-658-1658
Completed Roof Section
www.outdoorlivingtoday.com
Page 28
1 1/2" gap at
front and rear.
3M - Roof/Facia Nailing Strips
(3/4" x 1 1/2" x 72") x 2
3N - Roof/Facia Nailing Strips
(3/4" x 1 1/2" x 44") x 2
(S2 - 1 1/4" Screws) x 14 total
sales@outdoorlivingtoday.com
Parts
Hardware

Advertisement

Table of Contents
loading

Table of Contents