OLT STU128 Assembly Manual page 8

12x8 studio garden shed - plywood roof
Hide thumbs Also See for STU128:
Table of Contents

Advertisement

1. Floor Section
Plywood Floor
Small - 3pcs.
(Part 1E)
Floor Joist
FramesSmall -
3pcs. (Part 1C)
Floor Joist
Frames Large -
3pcs. (Part 1A)
Center Floor
Joists - 6pcs.
(Part 1B)
1.
Lay out 1A - Floor Joist Frames and two of 1B - Floor Joists as
illustrated above. Position Joists equally in Floor Joist Frame. Use
1C - Small Floor Joist Frame as a template to determine joist
position. Position Joist so flush with framing.
2.
When correctly positioned, attach each Joist with 4 - 2 1/2" screws
(2 per end). You can find the Square Drive Screw Bit in the Hardware
Kit Bag. Complete 2 remaining Large Floor Joist Frames.
Toll Free 1-888-658-1658
Plywood Floor
Large - 3pcs. (Part 1D)
www.outdoorlivingtoday.com
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
Note: Floor Footprint is 136 1/2" wide x 96" deep.
Concrete Pad
(optional foundation method)
Flush
with
framing
Page 8
Floor Runners -
10pcs. (Part 1F)
Parts (Steps 1 - 2)
1A - Large Floor Joist Frames
(45 1/2" x 75") x 3
1B - Floor Joists
(1 1/2" x 3 1/2" x 71 3/4") x 6
Hardware
S1 - 2 1/2" Screws
x 24 total
sales@outdoorlivingtoday.com

Advertisement

Table of Contents
loading

Table of Contents