Metal Core Drilling
Assembly
Fitting the network cable
Steps that must be completed:
-
Fit the electronics
-
Assembling the control panel
Tools:
-
Torx T15, T20
3
1
5
6
2
C-SC_CSSM
2
4
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
1.
Position the mains cable (1).
2.
Position the cable clamp (2).
3.
Screw in the screw (3) [0.9 Nm
4.
Position the cover (4).
5.
Screw in the screw (5) [1.8 Nm
6.
Screw in the screw (6).
34130550060
Printed in Germany
±0.1 Nm
].
±0.1 Nm
].
01.04.2021
Page 61 of 92