Assembling The Electronics - Fein KBE 52-2 M Repair Instructions

Table of Contents

Advertisement

Metal Core Drilling
Assembly

Assembling the electronics

Steps that must be completed:
-
Positioning the protective hose
-
Positioning the magnetic foot
Tool(s):
-
Torx T20
2
4
3
3
3
C-SC_CSSM
1.
2.
1
3
3.
4.
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
Position the electronics (1).
Screw in the two screws (2).
Position the cover (3) with the electronics.
Place the protective hose (4) in the recess.
01.04.2021
34130550060
Printed in Germany
Page 59 of 92

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jme 202 m

Table of Contents