Assembling The Intermediate Gear Box - Fein KBE 52-2 M Repair Instructions

Table of Contents

Advertisement

Metal Core Drilling
Assembly

Assembling the intermediate gear box

Steps that must be completed:
-
Assembling the armature
Tool(s):
-
Arbor press
-
Sleeve
10 mm inner diameter, 21 mm outer diameter
15 mm inner diameter, 30 mm outer diameter
1
2
3
C-SC_CSSM
1.
2.
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
Press in the deep groove ball bearings (1).
P
LEASE NOTE
Damage to the armature.
The armature (2) can be damaged by the plate (3) being
positioned incorrectly.
Note the position of the plate (3).
Press in the armature (2).
34130550060
Printed in Germany
:
01.04.2021
Page 83 of 92

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jme 202 m

Table of Contents