Metal Core Drilling
Assembly
Positioning the protective hose
Steps that must be completed:
-
Assembling the protective hose
1
2
Photo shows similar product
C-SC_CSSM
1.
2.
3.
4.
3
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
Apply grease to the sealing ring (1).
Position the sealing ring (1).
Position the protective hose (2).
Connect the cable to the plug (3).
01.04.2021
34130550060
Printed in Germany
Page 56 of 92