Metal Core Drilling
Disassembly
Disassembling the shaft
Steps that must be completed:
-
Removing the shaft
Tool(s):
-
Circlip pliers
-
Arbor press
-
Sleeve
36 mm inner diameter, 55 mm outer diameter
1
2
C-SC_CSSM
1.
2.
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
Remove the circlip (1).
Press the grooved ball bearing (2) off the
01.04.2021
34130550060
Printed in Germany
shaft.
Page 31 of 92