Positioning The Control Panel - Fein KBE 52-2 M Repair Instructions

Table of Contents

Advertisement

Metal Core Drilling
Assembly

Positioning the control panel

Steps that must be completed:
-
Assembling the control panel
-
Fit the mains cable
Tools:
-
Torx T20
2
C-SC_CSSM
1.
1
2.
Version 1.0
All rights reserved by FEIN, especially in case of property rights applications.
FEIN retains all rights of disposal, such as copying and circulation.
Position the cover (1).
Connect all plug connections (2) as shown in the
connection diagram.
01.04.2021
34130550060
Printed in Germany
Page 64 of 92

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jme 202 m

Table of Contents